Project details

  • Сategory: Drying chambers
  • Customer: "VolynWestWood" LLC
  • Location: Volyn region, village Povorsk
  • Date: February 2024

Wood drying chamber KS50-7 A
one-time loading of 50 m3

A timber drying chamber KS50-7 A with a single loading volume of 50 m3 was manufactured and installed. We made a camera in a universal configuration. The SPAL system was installed - increasing the heating and ventilation power for drying the container blank. Preparations were made for the installation of a second chamber of the same volume. A 300 kW boiler was installed to heat the chambers.