Project details
- Сategory: Drying chambers
- Customer: "VolynWestWood" LLC
- Location: Volyn region, village Povorsk
- Date: February 2024

Wood drying chamber KS50-7 A
one-time loading of 50 m3
A timber drying chamber KS50-7 A with a single loading volume of 50 m3 was manufactured and installed. We made a camera in a universal configuration. The SPAL system was installed - increasing the heating and ventilation power for drying the container blank. Preparations were made for the installation of a second chamber of the same volume. A 300 kW boiler was installed to heat the chambers.